ORPP logo
Image from Google Jackets

Army's Future Combat System Program.

By: Material type: TextTextSeries: Defense, Security and StrategiesPublisher: New York : Nova Science Publishers, Incorporated, 2009Copyright date: ©2009Edition: 1st edDescription: 1 online resource (160 pages)Content type:
  • text
Media type:
  • computer
Carrier type:
  • online resource
ISBN:
  • 9781613240809
Subject(s): Genre/Form: Additional physical formats: Print version:: Army's Future Combat System ProgramDDC classification:
  • 355.033573
LOC classification:
  • UC263 -- .A85 2009eb
Online resources:
Contents:
Intro -- THE ARMY'S FUTURECOMBAT SYSTEM PROGRAM -- THE ARMY'S FUTURE COMBAT SYSTEM PROGRAM -- CONTENTS -- PREFACE -- THE ARMY'S FUTURE COMBATSYSTEMS PROGRAM AND ALTERNATIVES -- PREFACE -- SUMMARY -- DESCRIPTION OF THE ARMY'S FUTURECOMBAT SYSTEMS PROGRAM -- Manned FCS Vehicles -- Unmanned Aerial and Ground Vehicles -- Unattended Sensors, Intelligent Munitions, Launchers, and the Network -- Schedule for Fielding FCS Components -- Costs of the Army's FCS Program -- Concerns About the FCS Program -- Growth of the FCS Program's Costs -- Alternative Approaches to Modernizing the Army's Heavy Forces -- THE ARMY'S HEAVY FORCES AND ARMORED VEHICLES -- Overview of the Army's Armored Vehicle Fleet at the End of 2003 -- Issues Regarding Today's Armored Forces and Vehicles -- DESCRIPTION OF THE ARMY'S MODULARITY INITIATIVE ANDFUTURE COMBAT SYSTEMS PROGRAM -- The Modularity Initiative -- The Future Combat Systems Program -- POTENTIAL EFFECTS OF AND CONCERNSABOUT THE ARMY'S MODERNIZATION PLANS -- How Modernization Plans Would Affect the Army's Budget -- How Modernization Plans Would Affect theArmy's Ability to Deploy Units Quickly -- How the Administration's Plan Would Affect theArmy's Armored Combat Vehicle Fleet -- Concerns Regarding the Army's FCS Program -- ALTERNATIVE APPROACHES TO MODERNIZINGTHE ARMY'S HEAVY FORCES -- Alternative 1. Develop and Procure FCS Componentsthat Will Collect and Disseminate Information -- Alternative 2. Develop and Procure FCS Componentsthat Will Enhance the Army's Long-Range Strike Capability -- Alternative 3. Emphasize Investment in New Manned Combat Vehicles -- Alternative 4. Develop a Scaled-Down FCS Networkand Integrate It with Existing Systems -- APPENDIX A. A DESCRIPTION AND HISTORYOF THE ARMY'S CURRENT ARMORED VEHICLES -- Abrams Tanks -- Bradley Fighting Vehicles -- The M113 Family of Vehicles.
M109 Self-Propelled Howitzer -- APPENDIX B. CBO'S METHODS FOR ESTIMATINGAIRLIFT REQUIREMENTS -- Unconstrained Airlift Operations -- Constrained Airlift Operations -- APPENDIX C. DEFINITIONS OF TECHNOLOGY READINESS LEVELSAND ASSESSMENTS OF CRITICAL TECHNOLOGIES FOR THE ARMY'SFUTURE COMBAT SYSTEMS PROGRAM -- APPENDIX D.METHODS USED TO ESTIMATE COSTS -- Estimating Costs of FCS Components -- Research and Development Costs -- Procurement Costs -- Basis for Estimates of Cost Growth -- Estimates of Costs to Upgrade Current Systems -- NOTES -- REFERENCES -- THE ARMY'S FUTURE COMBAT SYSTEM (FCS):BACKGROUND AND ISSUES FOR CONGRESS∗ -- ABSTRACT -- ISSUES FOR CONGRESS -- BACKGROUND -- FCS Program Origins -- THE FCS PROGRAM -- Program Overview[11] -- FCS Program Timeline -- March 2008 GAO Reports[20] -- Selected FCS Program Issues -- FCS Program Budget -- POTENTIAL ISSUES FOR CONGRESS -- What Is the Future of the 15 FCS BCTs? -- What Are the Programmatic, Budgetary, and OperationalImpacts of the June 2008 Program Restructuring? -- Increasing Role of FCS Lead Systems Integrators[64] -- ADDITIONAL READING -- APPENDIX. FCS SUBSYSTEMS -- Manned Ground Vehicles -- Unmanned Aerial Vehicles (UAVs)[70] -- Unmanned Ground Vehicles (UGVs)[72] -- The Network[74] -- REFERENCES -- INDEX.
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
No physical items for this record

Intro -- THE ARMY'S FUTURECOMBAT SYSTEM PROGRAM -- THE ARMY'S FUTURE COMBAT SYSTEM PROGRAM -- CONTENTS -- PREFACE -- THE ARMY'S FUTURE COMBATSYSTEMS PROGRAM AND ALTERNATIVES -- PREFACE -- SUMMARY -- DESCRIPTION OF THE ARMY'S FUTURECOMBAT SYSTEMS PROGRAM -- Manned FCS Vehicles -- Unmanned Aerial and Ground Vehicles -- Unattended Sensors, Intelligent Munitions, Launchers, and the Network -- Schedule for Fielding FCS Components -- Costs of the Army's FCS Program -- Concerns About the FCS Program -- Growth of the FCS Program's Costs -- Alternative Approaches to Modernizing the Army's Heavy Forces -- THE ARMY'S HEAVY FORCES AND ARMORED VEHICLES -- Overview of the Army's Armored Vehicle Fleet at the End of 2003 -- Issues Regarding Today's Armored Forces and Vehicles -- DESCRIPTION OF THE ARMY'S MODULARITY INITIATIVE ANDFUTURE COMBAT SYSTEMS PROGRAM -- The Modularity Initiative -- The Future Combat Systems Program -- POTENTIAL EFFECTS OF AND CONCERNSABOUT THE ARMY'S MODERNIZATION PLANS -- How Modernization Plans Would Affect the Army's Budget -- How Modernization Plans Would Affect theArmy's Ability to Deploy Units Quickly -- How the Administration's Plan Would Affect theArmy's Armored Combat Vehicle Fleet -- Concerns Regarding the Army's FCS Program -- ALTERNATIVE APPROACHES TO MODERNIZINGTHE ARMY'S HEAVY FORCES -- Alternative 1. Develop and Procure FCS Componentsthat Will Collect and Disseminate Information -- Alternative 2. Develop and Procure FCS Componentsthat Will Enhance the Army's Long-Range Strike Capability -- Alternative 3. Emphasize Investment in New Manned Combat Vehicles -- Alternative 4. Develop a Scaled-Down FCS Networkand Integrate It with Existing Systems -- APPENDIX A. A DESCRIPTION AND HISTORYOF THE ARMY'S CURRENT ARMORED VEHICLES -- Abrams Tanks -- Bradley Fighting Vehicles -- The M113 Family of Vehicles.

M109 Self-Propelled Howitzer -- APPENDIX B. CBO'S METHODS FOR ESTIMATINGAIRLIFT REQUIREMENTS -- Unconstrained Airlift Operations -- Constrained Airlift Operations -- APPENDIX C. DEFINITIONS OF TECHNOLOGY READINESS LEVELSAND ASSESSMENTS OF CRITICAL TECHNOLOGIES FOR THE ARMY'SFUTURE COMBAT SYSTEMS PROGRAM -- APPENDIX D.METHODS USED TO ESTIMATE COSTS -- Estimating Costs of FCS Components -- Research and Development Costs -- Procurement Costs -- Basis for Estimates of Cost Growth -- Estimates of Costs to Upgrade Current Systems -- NOTES -- REFERENCES -- THE ARMY'S FUTURE COMBAT SYSTEM (FCS):BACKGROUND AND ISSUES FOR CONGRESS∗ -- ABSTRACT -- ISSUES FOR CONGRESS -- BACKGROUND -- FCS Program Origins -- THE FCS PROGRAM -- Program Overview[11] -- FCS Program Timeline -- March 2008 GAO Reports[20] -- Selected FCS Program Issues -- FCS Program Budget -- POTENTIAL ISSUES FOR CONGRESS -- What Is the Future of the 15 FCS BCTs? -- What Are the Programmatic, Budgetary, and OperationalImpacts of the June 2008 Program Restructuring? -- Increasing Role of FCS Lead Systems Integrators[64] -- ADDITIONAL READING -- APPENDIX. FCS SUBSYSTEMS -- Manned Ground Vehicles -- Unmanned Aerial Vehicles (UAVs)[70] -- Unmanned Ground Vehicles (UGVs)[72] -- The Network[74] -- REFERENCES -- INDEX.

Description based on publisher supplied metadata and other sources.

Electronic reproduction. Ann Arbor, Michigan : ProQuest Ebook Central, 2024. Available via World Wide Web. Access may be limited to ProQuest Ebook Central affiliated libraries.

There are no comments on this title.

to post a comment.

© 2024 Resource Centre. All rights reserved.