Rapid Excavation and Tunneling Conference : 2019 Proceedings.
Material type:
- text
- computer
- online resource
- 9780873354714
- 624.193
- TA800 .R375 2019
Cover -- Copyright -- Contents -- Preface -- Executive Committee -- Session Chairs -- International Committee -- PART 1: Contracting Practices and Cost -- Are Alternative Delivery Methods and Private Financing Ways to Deliver Future Underground Projects in America? -- Design-Build Construction in Underground Construction: A Contractor's Perspective -- Having Difficulty Deciding on Procuring New, Refurbished or Remanufactured TBMs? -- Incentive-Based Project Delivery with Fixed Price Incentive Fee Contracts -- North American Tunneling Industry Firsts in the Midwest: The Blacksnake Creek Stormwater Separation Improvement Tunnel -- Progressive Design-Build-Is It Coming to a Project Near You? -- A Study in the Use of Design-Build for Tunnel Projects -- Tunnel Contracting Practice: One Owner's State of the Art -- PART 2: Design and Planning -- Crosstown Tunneling for Houston Surface Water Supply -- Design and Construction Procurement for the Amtrak Hudson Tunnel Project -- Liner Load Estimation for Soft Ground Pressure Balance TBM Shield Tunnel Projects -- TBM Utilization in Mixed Transitional Ground: The OCIT Experience in Akron, Ohio -- Times Square Shuttle Station Reconstruction -- PART 3: Design/Build Projects -- Controlling Risk of Tunneling Projects Implemented by Alternative Delivery Method -- DC Clean Rivers Project: We Built Miles of Tunnel…Now What? How to Get the CSOs into the Tunnels in an Urban Environment -- Design and Construction of Montreal Express Link Tunnels and Underground Stations -- Design and Construction of NBAQ4 Water Transfer Scheme -- Evolution of Tunnel Eyes Designs Based on Lessons Learned for the Regional Connector Project in Los Angeles -- LA Metro Regional Connector Transit Project: Successful Halfway-Through Completion.
Permitting in a Design/Build Environment-The Challenges of 120 Years of a Design Bid Build Culture -- West Gate Tunnel Project-Evolution in Three Lane TBM Road Tunnel Design -- PART 4: Difficult Ground -- Breaking Through Tough Ground in the Himalayas: Nepal's First TBM -- Challenging Geology: Blacklick Creek Sanitary Interceptor Sewer Project in Columbus, OH -- Cutting New Ground: TBM Selection for Fort Wayne Utilities Tunnel Works Program -- Ground Freezing to Improve Unstable Silty Ground -- Neelum-Jhelum Hydroelectric Project: Design and Construction Challenges of Underground Works -- Removal of Large Concrete Obstruction on 96-Inch Pipe Ram Crossing of Highway 61, Neebing, Ontario -- Unexpected Underground Obstructions: Challenges and Lessons Learned from Angeli, the Regional Connector TBM -- PART 5: Drill and Blast -- Applying Lessons Learned and Taking on New Challenges at the Lake Mead Intake No. 3 Low Lake Level Pumping Station Project -- Comparison of Emulsion and Anfo Usage in the Horizontal Development Process at El Teniente -- Connecting the TARP Des Plaines Tunnel System to the McCook Reservoir -- Construction of the Luck Stone Inter-Quarry Tunnel, Leesburg Virginia -- Drill and Blast Construction of Shafts and Starter and Tail Tunnels for the 3RPORT CSO Project -- PART 6: Environment, Health, and Safety -- Commissioning of Tunnel Fire Life Safety Systems and Its Challenges -- A Comparison of Breathing Gasses Used Under Hyperbaric Conditions -- Conception and Construction of a Tailor-Made and Contractor‑Built Refuge Chamber for TBM and SEM Drives According to German Guidelines -- InSAR Monitoring of Subsidence Induced by Underground Mining Operations -- Minimizing Impacts to the Community and Commuters: Constructing the District of Columbia's Largest Tunnel Along a Major Urban Artery.
Optimization of a Ventilation System by Using Flow Measurements and 3D CFD Simulations -- Transit Tunnel TBM Vibration Through Glacial Till -- PART 7: Future Projects -- Alexandria Renew Enterprises Is Now in the Tunnel Business -- DART D2 Subway Project Development -- Mountain Tunnel Improvements Project -- MWRA Metropolitan Boston Tunnel Redundancy Program Project Update -- Unique Design Challenges of the Central Bayside System Improvement Project Tunnel Connections and Shafts -- PART 8: Geotechnical Considerations -- Anacostia River Tunnel Project Groundwater Drawdown Effects from the Deep Well Depressurization System at the CSO-019 Drop Shaft -- Digging Deeper-Supplemental Geotechnical Site Investigation for Parallel Thimble Shoal Tunnel -- How to Quantify the Reliability of a Geological and Geotechnical Reference Model in Underground Projects -- Innovative Monitoring for Urban Tunneling -- Packer and Long-Term Aquifer Testing to Estimate Tunnel Inflows: A Case History for the Lower Meramec Tunnel, St. Louis, MO -- Underground Construction, Geology and Geotechnical Risk -- Use and Misuse of Geotechnical Baselines to Predict Soft Ground TBM Tool Wear -- Writing the GBR So the Contractor Can Understand It -- PART 9: Ground Support and Final Lining -- 7.93 m Open TBM Shotcrete System Improvement and Innovation Jilin Project, China -- Complex Tunnel Through the Abutment of the High-Risk Chimney Hollow Dam -- Design Diagrams for Fiber Reinforced Concrete Tunnel Linings -- Steel Fiber Segmental Linings for Mega TBMs -- PART 10: Grouting and Ground Modification -- Differences in Consolidation Grouting Practices Between Near Surface and Underground Applications -- Grouting a TBM Shotcrete Lining Under Challenging Conditions -- Grouting and Groundwater in the Greater Arncliffe Area, WestConnex New M5 Tunnels, Sydney, Australia.
Quality Control of Secant Piles and Jet Grouting for the Ohio Canal Interceptor Tunnel -- PART 11: Hard Rock TBMs -- Rand Park Stormwater Diversion Tunnel-Planning and Designing to Address Stormwater Flooding for Downtown Keokuk, Iowa -- The Three Rivers Protection and Overflow Reduction Tunnel (3RPORT)-Decision-Making During Construction -- TBMs: Meeting the Challenge in Pakistan's Lower Himalayas -- Waterway Protection Tunnel: Louisville's Innovative Solution to Four Storage Basins -- PART 12: Large Span Tunnels and Caverns -- Construction Considerations for Garage Cote Vertu in Montreal -- First Large Diameter Hard Rock CSO Chamber in St. Louis -- Rock Load Estimation for Shallow Rock Caverns -- Use of Spray Applied Waterproofing on the Downtown Bellevue Tunnel Project -- PART 13: New and Innovative Technologies -- Artificial Intelligence Technique for Geomechanical Forecasting -- Evaluating Impact of Water Content on EPB Machine Performance Based on Laboratory Experiments -- The Expanding Capabilities of Microtunneling Demonstrated in Washington DC -- High-Speed 3D Tunnel Inspection -- Implementation of Automation and Digitization in Tunnel Waterproofing and Grouting Practices -- Sandwich Belt High Angle Conveyors Exclusively at Paris Metro Expansion-2019 -- SCMAGLEV-Fast and Innovative Mode of Transportation in the Northeast Corridor-Tunneling Challenges -- Smart Office: A Data-Driven Management Tool for Mechanized Tunneling Construction -- Tunnel Survey Control in Small Segmentally Lined Tunnels -- PART 14: Pressure Face TBM Case Histories -- Effectiveness of Risk Mitigation Strategies for Large Diameter One-Pass Tunnels in Mixed Ground from Ohio Canal Interceptor Tunnel Construction -- EPB Clogging Through Mixed Transitional Ground, Lessons Learned at the Ohio Canal Interceptor Tunnel, Akron, OH.
Planning, Design and Construction of the Regional Connector Bored Tunnels-An EPB Tunneling Case History -- Preparation for Tunneling, Don River & -- Central Waterfront Coxwell Sanitary Bypass Tunnel Project in Toronto, ON -- Tunneling in Mixed Face Conditions: An Enduring Challenge for EPB TBM Excavation -- PART 15: Pressure Face TBM Technology -- Curved Microtunneling Alignments in the Design Toolbox -- Forrestfield Airport Link-Project Challenges and TBM Solution -- Interpretation of EPB TBM Graphical Data -- Mechanized Tunneling at High Pressure-More Than Just a Stronger Bulkhead -- Proposal of Some Cuttability Indexes for Evaluating the Performance of Mechanical Excavators Using Conical Picks -- Tuen Mun-Chek Lap Kok Link in Hong Kong-Innovative Technologies and Methodologies for an Outstanding Project -- PART 16: SEM/NATM -- Culvert Construction Under I‑89 in Vermont Using the Sequential Excavation Method -- Delivering Value Through the Innovative Contractor Engagement (ICE) Model at London Underground Bank Station Capacity Upgrade Project -- SEM-Single Shell Lining Application for the Brenner Base Tunnel -- SEM Cavern Construction in Downtown LA -- SEM Tunnel Herrschaftsbuck: A Geological Challenge in Germany's Southwest -- Shallow SEM Tunneling with Limited Clearance to Existing Structures: Design, Construction and Observations -- Soft Ground Tunnelling Techniques for Mine Access Development -- Steep Inclined SEM Excavation-Successful Execution Applying Drill and Blast -- PART 17: Shafts and Mining -- Construction of Combined Sewer Overflow 021 Diversion Facilities in the District of Columbia -- Design and Construction Considerations for Large Shafts in Hudson River Tunnel Project: Hoboken Shaft -- Design Challenges of Deep Underground Shafts -- Merry Christmas!-Emergency Repair of the PCI‑12A Interceptor Collapse in Macomb County Michigan.
The Role of Mechanized Shaft Sinking in International Tunnelling Projects.
Description based on publisher supplied metadata and other sources.
Electronic reproduction. Ann Arbor, Michigan : ProQuest Ebook Central, 2024. Available via World Wide Web. Access may be limited to ProQuest Ebook Central affiliated libraries.
There are no comments on this title.